Notr · design system

Notr

Voice/text project-tracking app — mobile-first, single dark theme, one accent color. Tokens → Primitives → Blocks → Screens: each layer is built only from the layer below it, so there's one place to fix when the UI changes. Every control on this page is the real bundle.css, the same file every screen recreation on the Flow tab uses — nothing here is redrawn separately. Built from the Notr design handoff (Notr.dc.html); the two darkest muted-gray text tokens are kept exact even though they read under WCAG's 4.5:1 floor at their actual size — see their usage notes below.

Tokens

color · type · spacing · radius · shadow

Color

background
#0f1115
Screen background, every screen.
surface
#171a20
Cards and rows.
surface-2
#1c2028
Inputs, inactive chips, secondary buttons.
border
#262a31
Default 1px border, virtually everywhere.
border-hover
#3a3f47
Hover/active border.
text-primary
#f2f2f2
Titles, headings, active labels.
text-secondary
#dfe1e6
Body copy on cards, transcripts.
text-muted
#6b7280
Eyebrows, timestamps. ~3.9:1 on background — kept exact per source, not promoted to primary content.
text-muted-mid
#8b9099
Sheet URLs, secondary meta. Same sub-4.5:1 note as text-muted.
text-muted-strong
#9099a3
Cancel, inactive tabs, footer counts.
accent
oklch(0.65 .15 160)
The one accent. Primary actions and active state only.
accent-hover
oklch(0.7 .15 160)
Hover/press on any accent element.
accent-text
oklch(0.78 .15 160)
Accent label on dark ground: active chip, confirmed badge, links.
on-accent
#0f1115
Text/icons on a solid accent fill.
accent-tint
oklch(.65 .15 160 / .16)
Active chip / confirmed badge background.
accent-tint-border
oklch(.65 .15 160 / .4)
Paired with accent-tint.

Type — Manrope

screen-title / 26 / 800Notes
section-title / 18 / 700New note
body / 15 / 400Type a note…
snippet / 14 / 500340 records digitized, on track for Friday.
meta / 12 / 60009:12 · Lighthouse Retrofit
eyebrow / 12 / 600Transcript
button-label / 14 / 700Confirm all

Spacing

space-1
4px
space-2
8px
space-3
13px
space-4
16px
space-5
20px
space-6
28px

Radius & shadow

radius-sm
8px
radius-tag
10px
radius-md
12px
radius-lg
14px
radius-pill
20px
+
fab
0 8 20 / .4

Primitives

single-purpose atoms

The smallest reusable controls — each does exactly one job and composes into the Blocks below.

Button

Icon button / FAB

Chip

Tag pill / Badge

Lighthouse Retrofit Unassigned Pending Confirmed Rejected Voice note

Checkbox / Toggle switch

Text field

Blocks

composed from primitives

Bigger, screen-facing pieces — each built only from the primitives above plus layout.

Card

Lighthouse Retrofit
sheets.google.com/d/1a2b3c…
12 notes Added 2m ago
Selected state

App header / top nav

Tab bar

Bottom action bar

Bottom sheet

Choose a project
3 notes selected — choose a project

Audio player

2:14

Note glyph

audio_capture text_fields check

Note row

audio_capture
2m ago Lighthouse Retrofit
Task t‑056 due date needs to move a week, crack in beam 4 means work is paused until the structural inspection clears it.

Changelog entry

Lighthouse Retrofit 2m ago
Status → Blocked
“crack found in beam 4”

Proposal card

tasks Pending
Status
On track → Blocked
“crack found in beam 4, work paused”
tasks Confirmed
Owner
Mai → Somchai
“owner changed Mai to Somchai”

Screens

8 screens · 10 states

Every screen, browsable on its own. For the paths and named alternatives between them, see the Flow tab.

9:41
Last polled 2m ago · Poll now
audio_capture
09:12 Lighthouse Retrofit
Task t‑056 due date needs to move a week, crack in beam 4 means work is paused until the structural inspection clears it.
text_fields
yesterday Unassigned
340 records digitized, on track for Friday’s deadline pending final QA on the last batch.
SCR-01Notes — defaultView in flow →
9:41
2 selected
check
09:12 Lighthouse Retrofit
Task t‑056 due date needs to move a week, crack in beam 4 means work is paused until the structural inspection clears it.
check
yesterday Unassigned
340 records digitized, on track for Friday’s deadline pending final QA on the last batch.
SCR-01bNotes — multi-selectView in flow →
New note
Project (optional)
SCR-02New text note — bottom sheetView in flow →
9:41
Voice note
09:12 Lighthouse Retrofit
2:14

Task t‑056 due date needs to move a week, crack in beam 4 means work is paused until the structural inspection clears it.

SCR-03Note detailView in flow →
Choose a project
2 notes selected — choose a project
SCR-04Project picker — bottom sheetView in flow →
9:41
Review changes
2 notes
tasksPending
Status
On track → Blocked
“crack found in beam 4”
tasksConfirmed
Owner
Mai → Somchai
“owner changed Mai to Somchai”
tasksRejected
Target
Fri → Mon
“target date pushed”
1 pending
SCR-05Decision reviewView in flow →
9:41
Lighthouse Retrofit2m ago
Status → Blocked
“crack found in beam 4”
SCR-06Change logView in flow →
9:41
Lighthouse Retrofit
sheets.google.com/d/1a2b3c…
12 notes Added 2m ago
SCR-07Projects — defaultView in flow →
9:41
Add project
SCR-07bAdd projectView in flow →
9:41
Settings
Plaud Note Pro · Connected
Push notifications
SCR-08SettingsView in flow →