Notr · screen flow

Every path through Notr

The primary route and every named alternative through Notr's 8 screens, grouped into the three tab-root areas plus Settings and traced as a tree, so each outcome shows exactly which screen it lands on. Screen codes (SCR-01 …) are the same tokens, components, and class names as the production PWA, laid out as static Gallery frames. Source: the Notr design handoff (Notr.dc.html).

connector branch label outcome, screen drawn below jumps to SCR-0X → outcome, screen shown elsewhere (no duplicate frame) italic note — cross-flow pointer or detail

Notes

tab · home

The capture & triage lane — where every voice/text note lands, gets read, and gets pushed toward a project decision.

9:41
Last polled 2m ago · Poll now
audio_capture
09:12Lighthouse Retrofit
Task t‑056 due date needs to move a week, crack in beam 4 means work is paused until the structural inspection clears it.
text_fields
yesterdayUnassigned
340 records digitized, on track for Friday’s deadline pending final QA on the last batch.
audio_capture
MonLighthouse Retrofit
Crack found in beam 4, work paused until the structural inspection clears it — jaa mai dai laew.
SCR-01Notes — default
Tap a note row
9:41
Voice note
09:12 Lighthouse Retrofit
2:14

Task t‑056 due date needs to move a week, crack in beam 4 means work is paused — jaa mai dai laew, phrung-ni tong yut ngan wai gorn.

SCR-03Note detail
← jumps to SCR-01
Tap '+' FAB
New note
Project (optional)
SCR-02New text note — bottom sheet
Save → closes, back to SCR-01
Tap the settings icon
jumps to SCR-08 →
Tap a note's glyph to select
9:41
2 selected
check
09:12Lighthouse Retrofit
Task t‑056 due date needs to move a week, crack in beam 4 means work is paused until the structural inspection clears it.
text_fields
yesterdayUnassigned
340 records digitized, on track for Friday’s deadline pending final QA on the last batch.
check
MonLighthouse Retrofit
Crack found in beam 4, work paused until the structural inspection clears it.
SCR-01bNotes — multi-select
'Assign project' or 'Make decision'
Choose a project
2 notes selected — choose a project
SCR-04Project picker — bottom sheet
Pick a project row
9:41
Review changes
2 notes
tasksPending
Status
On track → Blocked
“crack found in beam 4”
tasksConfirmed
Owner
Mai → Somchai
“owner changed Mai to Somchai”
tasksRejected
Target
Fri → Mon
“target date pushed”
1 pending
SCR-05Decision review
Confirm → appends to SCR-06 ← jumps to SCR-01

Confirmed/rejected cards stay listed, dimmed — a session log, not a queue that empties.

Tap 'Cancel'
← jumps to SCR-01

Change log

tab

Read-only history — every field change Decision review confirmed, newest first. No outbound navigation of its own.

9:41
Lighthouse Retrofit2m ago
Status → Blocked
“crack found in beam 4”
Q3 Roadmapyesterday
Owner → Somchai
“owner changed Mai to Somchai”
SCR-06Change log

Newly confirmed proposals from SCR-05 Decision review prepend here live.

Projects

tab

The list of linked Google Sheets, and the one place new ones get added.

9:41
Lighthouse Retrofit
sheets.google.com/d/1a2b3c…
12 notes Added 2m ago
Q3 Roadmap
sheets.google.com/d/9x8y7z…
4 notes Added yesterday
SCR-07Projects — default
Tap '+' FAB
9:41
Add project
SCR-07bAdd project
Link → jumps to SCR-07
Tap a project card
jumps to SCR-01, filtered →

System

reached from the settings icon in the top nav

Settings isn't a tab — it's the one screen every lane can reach without belonging to any of them.

9:41
Settings
Plaud Note Pro · Connected
Push notifications
SCR-08Settings
← jumps to SCR-01