Notr · screen flow

Every path through Notr

The primary route and every named alternative through Notr's 8 screens, grouped into the three tab-root areas plus Settings and traced as a tree, so each outcome shows exactly which screen it lands on. Screen codes (SCR-01 …) are condensed recreations built from the same tokens and components as the Gallery — not literal production screens, since Phase 1 shipped the pipeline with no UI yet. Source: the Notr design handoff (Notr.dc.html).

connector branch label outcome, screen drawn below jumps to SCR-0X → outcome, screen shown elsewhere (no duplicate frame) italic note — cross-flow pointer or detail

Notes

tab · home

The capture & triage lane — where every voice/text note lands, gets read, and gets pushed toward a project decision.

9:41
Notes
Select ⋯
All
Unassigned
Lighthouse
Last polled 2m ago Poll now
●
09:12Lighthouse
Task t‑056 due date needs to move a week…
yesterdayUnassigned
340 records digitized, on track for Friday…
●
MonLighthouse
Crack found in beam 4, work paused…
+
Notes
Log
Projects
SCR-01Notes — default
Tap a note row
9:41
←Voice note
Edit
09:12Lighthouse Retrofit
2:14
TRANSCRIPT
Task t‑056 due date needs to move a week, crack in beam 4 means work is paused — jaa mai dai laew phrung-ni…
SCR-03Note detail
← jumps to SCR-01

"Edit" is visual only in the source handoff — no destination defined yet.

Tap '+' FAB
9:41
←New note
Type a note…
Project (optional)
Unassigned
Lighthouse
Save note
SCR-02New text note
Save → jumps to SCR-01
Tap 'Select', pick notes
9:41
Notes
Cancel
All
Unassigned
✓
●
Task t‑056 due date needs to move…
340 records digitized, on track…
✓
●
Crack found in beam 4, paused…
2 selected Assign project Make decision
SCR-01bNotes — multi-select
'Assign project' or 'Make decision'
Make decision
2 notes selected — choose a project
Lighthouse Retrofit›
Q3 Roadmap›
SCR-04Project picker — bottom sheet
Pick a project row
9:41
←Review changes
2 notes → Lighthouse Retrofit
StatusPending
On track → Blocked
✓ Confirm Edit ×
OwnerConfirmed
1 pendingConfirm all
SCR-05Decision review
Confirm → appends to SCR-06 ← jumps to SCR-01

Confirmed/rejected cards stay listed, dimmed — a session log, not a queue that empties.

Tap 'Cancel'
← jumps to SCR-01

Change log

tab

Read-only history — every field change Decision review confirmed, newest first. No outbound navigation of its own.

9:41
Change log
Lighthouse2m ago
Status → Blocked
"crack found in beam 4"
Q3 Roadmapyesterday
Owner → Somchai
"owner changed Mai to Somchai"
Notes
Log
Projects
SCR-06Change log

Newly confirmed proposals from SCR-05 Decision review prepend here live.

Projects

tab

The list of linked Google Sheets, and the one place new ones get added.

9:41
Projects
+
Lighthouse Retrofit
sheets.google.com/d/1a2b3c…
12 notesActive 2m ago
Q3 Roadmap
sheets.google.com/d/9x8y7z…
4 notesActive yesterday
Notes
Log
Projects
SCR-07Projects — default
Tap '+'
9:41
←Add project
Project name
Google Sheet URL
Link project
SCR-07bAdd project
Link → jumps to SCR-07
Tap a project card
jumps to SCR-01, filtered →

System

reached from Notes '⋯'

Settings isn't a tab — it's the one screen every lane can reach without belonging to any of them.

9:41
←Settings
CAPTURE
Plaud Note Pro · ConnectedDisconnect
POLLING
Every 15 min✓
NOTIFICATIONS
Push notifications
SCR-08Settings
← jumps to SCR-01